Cash flow planning of construction projects based on BIM and system dynamics
DOI:
https://doi.org/10.18041/1900-3803/entramado.1.6305Keywords:
Cash flow, Construction, Planning, Building Information ModelingAbstract
Cash flow planning of a construction project is a crucial activity to guarantee the financial resources necessary for construction activities development. Due to the importance, there is a need for cash flow analysis methodologies that are easy to adapt to modifications and involve high levels of detail, which allow improving precision in estimations and anticipating possible problematic events. Considering this need, this paper proposes a new methodological scheme for cash flow planning of construction projects, which is based on construction process models BIM 5D (Building Information Modeling 5D), and system dynamics. The proposed scheme consists of six main stages: 1) BIM 3D model and quantities, 2) work breakdown structure, 3) cost estimation, 4) BIM 5D digital modeling and simulation, 5) cash flow analysis, and 6) implementation. The application of the proposed scheme indicates that the speed, visualization, and automation, with which the cash flow planning is developed, favors the analysis of several alternatives, which strengthens decision-making processes, and improves planning results.
Downloads
References
AL-JOBURI, Khalil; AL-AOMAR, Raid; BAHRI, Mohammed. Analyzing the impact of negative cash flow on construction performance in the Dubai area. In: Journal of Management in Engineering. Octubre, 2012. vol. 28, no. 4, p. 382-390 https://doi.org/10.1061/(ASCE)ME.1943-5479.0000123
AMERICAN INSTITUTE OF ARCHITECTS. Integrated Project Delivery: A Guide. 2007. http://www.aia.org/groups/aia/documents/pdf/aiab083423.pdf
BECERIK, Burcin; JAZIZADEH, Farrokh; LI, Nan; CALIS, Gulben. Application areas and data requirements for BIM-enabled facilities management. In: Journal of Construction Engineering and Management. Marzo, 2012. vol. 138, no. 3, p. 431-442. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000433
BOHÓRQUEZ, Jherson; PORRAS, Hernán; SÁNCHEZ, Omar; MARIÑO, María. Planificación de recursos humanos a partir de la simulación del proceso constructivo en modelos BIM 5D. In: Entramado. Enero – Junio, 2018. vol. 14, no. 1, p. 252-267. http://dx.doi.org/10.18041/entramado.2018v14n1.27106
CHEN, Hong. Development of a systematic integration approach for multi-level cost flow prediction and management. In: University of Florida. 2002. https://ufdc.ufl.edu/AA00024610/00001
CHEN, Hong. Developing cost response models for company-level cost flow forecasting of project-based corporations. In: Journal of Management in Engineering. Octubre, 2007. vol. 23, no. 4, p. 171-181. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(171)
CHEN, Hong; O’BRIEN, William; HERBSMAN, Zohar. Assessing the accuracy of cash flow models: The significance of payment conditions. En: Journal of Construction Engineering and Management. Junio, 2005. vol. 131, no. 6, p. 669-676. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(669)
CHENG, M. Y.; CAO, M. T.; Herianto, J. G. Symbiotic organisms search-optimized deep learning technique for mapping construction cash flow considering complexity of project. In: Chaos, Solitons and Fractals. June, 2020. vol. 138, p. 109869. https://doi.org/10.1016/j.chaos.2020.109869
ELGHAISH, Faris; ABRISHAMI, Sepehr; ABU SAMRA, Soliman; GATERELL, Mark; HOSSEINI, Reza; WISE, Richard. Cash flow system development framework within integrated project delivery (IPD) using BIM tools. In: International Journal of Construction Management. Enero, 2019. p. 1-16. https://doi.org/10.1080/15623599.2019.1573477
FORRESTER, Jay. Industrial Dynamics. 1961. http://www.laprospective.fr/dyn/francais/memoire/autres_textes_de_la_prospective/autres_ouvrages_numerises/industrial-dynamics-forrester-1961.pdf
HERRERA, Rodrigo F.; SÁNCHEZ, Omar; CASTAÑEDA, Karen; PORRAS, Hernán. Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis. En: Applied Sciences. Agosto, 2020, vol. 10, no. 16, 5506. https://doi.org/10.3390/app10165506
JARRAH, Ra›ed; KULKARNI, Devdatta; O›CONNOR, James. Cash flow projections for selected TxDoT highway projects. En: Journal of Construction Engineering and Management. Marzo, 2007, vol. 133, no. 3, p. 235-241. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:3(235)
KEHILY, Dermot; UNDERWOOD, Jason. Embedding life cycle costing in 5D BIM. En: Journal of Information Technology in Construction, Septiembre, 2017. vol. 22, p. 145-167. https://www.itcon.org/2017/8
KHALAF, Mohammed; AKBAS, Ragip. Parametric construction cash flow modeling combined with Building Information Modeling and simulation. In: International Civil Engineering and Architecture Conference 2019. April, 2019. https://www.researchgate.net/publication/332951025_PARAMETRIC_CONSTRUCTION_CASH_FLOW_MODELING_COMBINED_WITH_BUILDING_INFORMATION_MODELING_AND_SIMULATION
KIM, Hyunjoo; GROBLER, Francois. Preparing a construction cash flow analysis using Building Information Modeling (BIM) technology. In: Journal of Construction Engineering and Management. Febrero, 2013, vol. 1, no. 1, p. 1-9. https://doi.org/10.6106/JCEPM.2013.3.1.001
KIM, Jin. Use of BIM for effective visualization teaching approach in construction education. In: Journal of Professional Issues in Engineering Education and Practice. Julio, 2012. vol. 138, no. 3, p. 214-223. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000102
LE, Thi; VU, Thi; VAN, Cong. Identifying factors influencing on the cash flow of construction companies: Evidence from Vietnam stock exchange. In: Management Science Letters. Julio, 2020. vol. 10, no. 1, p. 255-264. http://dx.doi.org/10.5267/j.msl.2019.7.036
LIU, Shu; WANG, Chang. Profit optimization for multiproject scheduling problems considering cash flow. In: Journal of Construction Engineering and Management. Diciembre, 2010. vol. 1, p. 129-133. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000235
LU, Qiqi; WON, Jongsung; CHENG, Jack. A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM). In: International Journal of Project Management. Septiembre, 2016. vol. 34, no. 1, p. 3-21. https://doi.org/10.1016/j.ijproman.2015.09.004
LU, Weisheng; PENG, Yi; SHEN, Qiping; LI, Heng. Generic model for measuring benefits of BIM as a learning tool in construction tasks. In: Journal of Construction Engineering and Management. Febrero, 2013. vol. 139, no. 2, p. 195-203. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000585
MAHALINGAM, Ashwin; KASHYAP, Rahul; MAHAJAN, Charudatta. An evaluation of the applicability of 4D CAD on construction projects. En: Automation in Construction. 2010, vol. 19, no. 2, p. 148-159. https://doi.org/10.1016/j.autcon.2009.11.015
MEJÍA, Guillermo; SÁNCHEZ, Omar; CASTAÑEDA, Karen; PELLICER, Eugenio. Delay causes in road infrastructure projects in developing countries. In: Revista de la Construcción. 2020, vol. 19, no. 2, p. 220-234. https://doi.org/10.7764/rdlc.19.2.220-234
MELIK, Serhat. Cash flow analysis of construction projects using fuzzy set theory. Thesis Master of Science in Civil Engineering. Middle East Technical University. Department of Civil Engineering. 2010. https://etd.lib.metu.edu.tr/upload/12612517/index.pdf
MINISTERIO DEL TRABAJO DE COLOMBIA. Calculadora laboral. Ministerio del trabajo de Colombia http://www.mintrabajo.gov.co/calculadora-laboral.html. 2020
MIRNEZAMI, S. A.; MOUSAVI, S. M.; MOHAGHEGHI, V. A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study. In: Engineering Applications of Artificial Intelligence. August, 2020. vol. 95, p. 103815. https://doi.org/10.1016/j.engappai.2020.103815
NAVON, R. Resource-based model for automatic cash-flow forecasting. In: Construction Management and Economics. Abril, 1995. vol. 13, no. 6, pp. 501-510. https://doi.org/10.1080/01446199500000058
NAVON, R. Company-level cash-flow management. En: Journal of Construction Engineering and Management. Marzo, 1996. vol. 122, no. 1, p. 22-29. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:1(22)
NING, M.; HE, Z.; JIA, T.; WANG, N. Metaheuristics for multi-mode cash flow balanced project scheduling with stochastic duration of activities. In: Automation in Construction. June, 2017. vol. 81, p. 224–233. https://doi.org/10.1016/j.autcon.2017.06.011
PARK, Hyung; HAN, Seung; RUSSELL, Jeffrey. Cash flow forecasting model for general contractors using moving weights of cost categories. En: Journal of Management in Engineering. Octubre, 2005. vol. 21, no. 4, p. 164-172. https://doi.org/10.1061/(ASCE)0742-597X(2005)21:4(164)
POLANCO SÁNCHEZ, Lina Marithza. Análisis de rendimientos de mano de obra para actividades de construcción - estudio de caso edificio J UPB. Universidad Pontificia Bolivariana. Facultad de Ingeniería Civil. Escuela de Ingenierías y Administración. 2009. 72 p. https://repository.upb.edu.co/handle/20.500.11912/635
PORRAS, Hernán; SÁNCHEZ, Omar; GALVIS, José. Metodología para la elaboración de modelos del proceso constructivo 5D con tecnologías “Building Information Modeling”. En: Revista Gerencia Tecnológica Informática. Abril, 2015. vol. 14, no. 38, p. 59-73. http://revistas.uis.edu.co/index.php/revistagti/article/view/4869
PORRAS, Hernán; SÁNCHEZ, Omar; GALVIS, José; JAIMEZ, Néstor; CASTAÑEDA, Karen. Tecnologías “Building Information Modeling” en la elaboración de presupuestos de construcción de estructuras en concreto reforzado. En: Entramado. Enero - junio, 2015. vol. 11, no. 1, p. 230-249. https://doi.org/10.18041/entramado.2015v11n1.21116
QIAN, Ang-Yu. Benefits and ROI of BIM for Multi-Disciplinary Project Management. Undergraduate. Singapore. National University of Singapore. 2012. 45 p. http://www.icoste.org/wp-content/uploads/2011/08/Benefits-and-ROI-of-BIM-for-Multi-Disciplinary-Project-Management.pdf
QING, Liu; TAO, Gao; PING, Wang. Study on building lifecycle information management platform based on BIM. In: Research Journal of Applied Sciences, Engineering and Technology. Enero, 2014. vol. 7, no. 1, p. 1-8. https://doi.org/10.19026/rjaset.7.212
SÁNCHEZ RIVERA, Omar Giovanny. Análisis del flujo de caja de la construcción de un proyecto con modelos BIM 5D y dinámica de sistemas. Trabajo de Maestría. Bucaramanga. Universidad Industrial De Santander. Facultad de Ingenierías Fisicomecánicas. Escuela de Ingeniería Civil. 2015. 248 p.
SU, Yi; LUCKO, Gunnar. Synthetic cash flow model with singularity functions. I: Theory for periodic phenomena and time value of money. In: Journal of Construction Engineering and Management. Febrero, 2015. vol. 141, no. 3, p. 1-12. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000938
SURETY INFORMATION OFFICE, 2015. Why Do Contractors Fail?. http://suretyinfo.org/?wpfb_dl=151.
TANG, C; LEUNG, A.; LAM, K. Entropy Application to Improve Construction Finance Decisions. In: Journal of Construction Engineering and Management. Octubre, 2006, vol. 132, no. 10, p. 1099-1113. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:10(1099)
WANG, Kun; WANG, Wei; WANG, Han; HSU, Pei; WU, Wei; KUNG, Chen. Applying building information modeling to integrate schedule and cost for establishing construction progress curves. In: Automation in Construction. Diciembre, 2016. vol. 72, p. 397-410. https://doi.org/10.1016/j.autcon.2016.10.005
WANG, Wei; WENG, Shao; WANG, Shih; CHEN, Cheng. Integrating building information models with construction process simulations for project scheduling support. In: Automation in Construction. Noviembre, 2014. vol. 37, p. 68-80. https://doi.org/10.1016/j.autcon.2013.10.009
Downloads
Published
Issue
Section
License
Copyright (c) 2020 Entramado

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.