Economic analysis between a multiple measurement center and a main mount for natural gas calculated by linear equations
DOI:
https://doi.org/10.18041/1909-2458/ingeniare.2.2880Keywords:
gas networks, cost analysis, networks dimensioning, linear equationsAbstract
This article shows a comparative analysis of a multi-family natural gas network for high-rise buildings. For this purpose, a system of multiple measurement center and another one of principal amount by buitrón are taken as reference. In both cases, the work was made with the same installed power and with the same material for hydrocarbon distribution pipes. The results obtained allow us to conclude that, for buildings with heights greater than five stories of height, the system of principal amount by buitrón is more efficient in costs and distribution of the fluid, as there is a lower consumption of materials and that the distance traveled is an important factor in the service pressure due to the friction in the walls of the pipes.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2017 Ingeniare

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.